Submit one simple job form and we generate your full compliance pack: commissioning reports, F-Gas records, equipment schedules and handover certificates. Built on UK F-Gas legislation, REFCOM guidance and manufacturer standards.

Compliance without the paperwork.

Your Compliance Packs
3 active
ACE-48291
12 Maple Drive, Leeds
Completed
ACE-48307
8 Oak Lane, Sheffield
In Review
ACE-48315
44 High Street, York
Submitted
Pack ready for ACE-48291
Domestic Packs
Commercial Packs
F-Gas Records
Handover Certificates
5+
Documents Produced
2–3 min
Minutes to Submit
100%
Accuracy Checked
UK
Nationwide Coverage
The Pipeline

How It Works

One job form in. Every compliance document out. No templates to edit, no paperwork to complete yourself, we generate the full suite from your single submission.

01

Create Your Project

Log in and complete one simple Job Information Form, customer details, equipment, refrigerant, pressure tests and photos. It takes 2–3 minutes and that's the only form you'll fill in.

  • Customer & installer details
  • System specifications
  • Upload nameplate photos
02

We Prepare Your Documentation

From your single submission, we generate every document in the suite, installation reports, commissioning certificates, F-Gas logbooks, handover packs and more. Each one checked for accuracy and branded as AirCon Docs.

  • Accuracy checked
  • No templates to edit
  • No paperwork to complete yourself
03

Receive Your Compliance Pack

Your complete document suite is returned electronically, ready to save, print or hand to your customer. Everything is stored securely against your project for future retrieval.

  • Save, print or hand over
  • Stored securely for retrieval
  • Professional format
The Foundation

Built on Legislation, Not Templates

Every document in the AirCon Docs suite is engineered from three sources, so every field exists for a reason and every document aligns with UK compliance requirements.

Government Legislation

What's legally required

The legal record-keeping obligations that define what must be documented for every installation.

  • Fluorinated Greenhouse Gases Regulations 2015
  • Environment Agency guidance
  • DEFRA guidance
  • GOV.UK F-Gas guidance

REFCOM

What installers do in practice

The recognised UK industry standard for F-Gas compliance, the documents installers already know and use.

  • F-Gas Logbook
  • Leak Test Record Sheet
  • Refrigerant Movement Guidance
  • Scheme Handbook

Manufacturer Commissioning

What engineers record on site

The technical data engineers capture during commissioning, pressure readings, superheat, subcooling and electrical tests.

  • Daikin
  • Mitsubishi Electric
  • Fujitsu
  • Panasonic
  • Toshiba

We don't copy existing paperwork.

Instead of replicating manufacturer-specific forms, we create the best version of every document, branded as AirCon Docs, designed to work for every manufacturer, and aligned with UK F-Gas legislation from the ground up.

Installation Handover Packs

Two Packs. Every Installation Covered.

Whether you're installing a domestic split system or a commercial multi-unit setup, we generate the complete handover pack from one simple job form. Choose the pack that matches your installation type.

Domestic Installation Pack

For residential split and multi-split systems

£50+ VAT
  • Commissioning Report
    Essential
  • F-Gas Installation Record
    Essential
  • Equipment Schedule
    Recommended
  • Customer Handover Certificate
    Recommended
  • Cover Page, Maintenance Advice & Warranty Info
    Supporting
Most comprehensive

Commercial Installation Pack

For commercial and multi-unit installations

£75+ VAT
  • Everything in the Domestic Pack
    Included
  • F-Gas Equipment Logbook
    Essential
  • Refrigerant Register
    Essential
  • Refrigerant Movement Record
    Essential
  • Equipment Asset Register
    Essential
  • Additional commissioning records
    Recommended
Compliance Resources

Why each document matters.

Every document in our domestic and commercial installation handover packs isn't just best practice - it's a legal requirement. Here's why each record exists and what the regulations say.

Commissioning Report

Domestic & Commercial
Building Regulations Part L (Conservation of Fuel and Power)

Under the Building Regulations (Part L in England, with equivalent provisions in Wales, Scotland and Northern Ireland), fixed building services including air conditioning systems should be commissioned to demonstrate they operate efficiently. The commissioning report verifies that nameplate details match installed equipment, the system has been tested, adjusted and balanced (TAB) to perform as designed, and that the installation complies with design and manufacturer specifications.

Non-compliance with Part L can lead to local authority enforcement and issues with building control sign-off for the property.

F-Gas Installation Record

Domestic & Commercial
UK F-Gas Regulation 2015 (No. 916)

It is a legal requirement under the UK F-Gas Regulations to record details of any stationary refrigeration or air conditioning system installed. The record must include the equipment's refrigerant charge, the installer's F-Gas certification details, and the installation date. This documentation must be retained for the lifetime of the equipment.

Failure to maintain these records can result in enforcement action by the Environment Agency and fines of up to £5,000 per offence.

Equipment Schedule

Domestic & Commercial
Consumer Rights Act 2015, Duty of Care

A detailed equipment schedule lists every indoor and outdoor unit installed, including manufacturer, model numbers, serial numbers and refrigerant type. This supports your duty of care by ensuring the customer has a clear record of exactly what was installed, making future maintenance, warranty claims and replacements straightforward.

Without an equipment schedule, customers struggle to identify their own system for warranty claims, maintenance and parts ordering, leading to disputes and chargebacks.

Customer Handover Certificate

Domestic & Commercial
Consumer Protection & Duty of Care

While not a single statutory document, providing a formal handover certificate is considered best practice and supports your duty of care under the Consumer Rights Act 2015. It confirms the customer has received all compliance documentation, warranties and manufacturer information, and understands how to operate and maintain their system.

Failing to provide a handover certificate can lead to customer disputes, chargebacks and reputational damage.

F-Gas Equipment Logbook

Commercial only
F-Gas Reg. Article 6, Record Keeping

Commercial installations with larger refrigerant charges must maintain a logbook of all F-Gas equipment on site. This includes the equipment's location, refrigerant type, charge quantity and leak-check history. The logbook must be kept up to date and made available for inspection by the regulator.

The Environment Agency can request this logbook during audits. Failure to produce it constitutes a breach of the F-Gas Regulations.

Refrigerant Register & Movement Record

Commercial only
F-Gas Reg. Article 6, Refrigerant Tracking

Commercial operators must maintain a refrigerant register tracking all refrigerant added, recovered and moved between systems. This record establishes the system's charge size, which determines the required leak-checking frequency - every 12 months for 5–50 tCO₂eq, every 6 months for 50–500 tCO₂eq, and every 3 months for 500 tCO₂eq or more. Automatic leak detection doubles these intervals and is mandatory at 500 tCO₂eq or above.

Without an accurate refrigerant register, the required leak-checking schedule cannot be demonstrated, leaving both installer and customer non-compliant.

These guides are provided for general information only and do not constitute legal advice. Regulations may change, always refer to the latest guidance from the Environment Agency and your local building control authority. For specific compliance questions, contact our team.

The Value

Why Use Us?

Installing air conditioning systems is your expertise. Preparing compliance documentation is ours.

Our document suite is built on three foundations: the Fluorinated Greenhouse Gases Regulations 2015, REFCOM scheme guidance, and manufacturer commissioning standards. Every field exists for a reason, not copied from templates, but designed to be the best version of every document.

Built Around Installers

One simple job form. A few photographs. We generate every document in the suite: installation reports, commissioning certificates, F-Gas logbooks, handover packs and more. No templates to edit, no paperwork to complete yourself.

Save hours of administration every week

Consistent, professional documentation

Improved record keeping

Faster customer handovers

Reduced paperwork burden

More time on site completing installations

Easy access to completed project records

A professional image for your business

Pay Per Project

One project. One pack.

No subscriptions. No commitments. No minimum volume. Just pay for each compliance pack when you need one.

Launch Offer

Your first project is FREE

Try AirCon Docs risk-free. Your first compliance pack is on us — domestic or commercial.

Domestic Residential
£25+ VAT

Per domestic installation pack

Commissioning Report
F-Gas Installation Record
Equipment Schedule
Customer Handover Certificate
Cover Page, Maintenance Advice & Warranty Info
Secure online storage
Start a Domestic Project
Commercial Most comprehensive
£50+ VAT

Per commercial installation pack

Everything in the Domestic Pack
F-Gas Equipment Logbook
Refrigerant Register & Movement Record
Equipment Asset Register
Additional commissioning records
Client-specific documentation
Start a Commercial Project
First project free
No monthly fees
No setup costs
Cancel anytime
Frequently Asked Questions

Questions, answered.

Everything you need to know about how AirCon Docs works.

Still have questions?

Get in touch →

Ready to install?
We'll handle the compliance.

Submit your project information in minutes. We'll prepare your complete compliance pack and return it ready for handover.

Start Your Project

Takes 2–3 minutes · Create your portal in 60 seconds

We use essential cookies to operate this website and keep your data secure. By clicking "Accept all", you agree to our use of cookies. Read our Privacy Policy.

AirCon Docs · DNO Renewables Ltd · GDPR Compliant